Question: Problem 3 ( 2 0 pts ) . A manufacturer of engine belts uses multipurpose manufacturing equipment to produce a variety of products. A technician
Problem pts A manufacturer of engine belts uses multipurpose manufacturing equipment to produce a
variety of products. A technician is employed to perform the setup operations needed to change the machines over
from one product to the next. The amount of time required to set up the machines is a random variable that follows
an exponential distribution with a mean of minutes. The number of machines requiring a new setup is a Poisson
random variable with an average of machines per hour will require setup ie arrival rate per hour per machine
The technician is responsible for setups on machines.
a Compute the service rate per hour.
b What percentage of time is the technician idle, or not involved in setting up a machine?
c On average, how long is a machine out of operation while waiting for the next setup to be completed?
d If the company hires another, equally capable technician to perform setups on these machines, how long
on average would a machine be out of operation while waiting for the next setup to be completed?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock