Question: Problem 3 [20 points]: A contractor is planning to use an elevating scraper for a small cut and fill operation (1,200 BCY). The material to

Problem 3 [20 points]: A contractor is planning to use an elevatingProblem 3 [20 points]: A contractor is planning to use an elevating scraper for a small cut and fill operation (1,200 BCY). The material to be hauled weighs 3,000 lb/bcy with a swell estimated to be 10% and shrinkage 20%. The rated heaped capacity is 11 cubic yards, and the rated maximum load is 28,000 lb. The scraper empty weight is equal to 36,000 lb. Its weight distribution while Empty is: 66% (Drive Axle), and 34% (Rear axle). Its weight distribution at rated max load is: 52% (Drive Axle), 48% (Rear axle). The distance between the cut and fill sites is equal to 1 mile through a linear road in firm earth with rolling resistance equal to 120 lb/ton. The scraper first climbs the road at an average uphill grade of 4% when hauling material the utilizes the same road to return empty. fixed time is equal to 1.5 minutes. Performance chart for given scraper is attached. Assume that traction and elevation do not affect performance.

scraper for a small cut and fill operation (1,200 BCY). The material

Table 5.1 Operating Factors for Earthmoving Operations Walker's Building Estimator's Reference Book, 25th ed. (Lisle, IL: Frank R. Walker Company, 1995), p. 2.38 . Gross Weight

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!