Question: Problem # 3 ( 6 % , ILOs: 1 ) It is required as fill material 1 0 0 0 m ' of compacted soil

Problem # 3(6%, ILOs: 1)It is required as fill material 1000 m' of compacted soil at void ratio (e)=0.6. Two sites are available to providefill materials as follows:Make necessary calculations to select the site which will give lower cost. Assume Gs to be the same for both sites.
Site no Void ratio Cost $/m3
A 0.85
B 1.1

Step by Step Solution