Question: Problem 3 A dress - making operation is being designed as an assembly line. The table below shows the tasks that need to be performed,

Problem 3
A dress-making operation is being designed as an assembly line. The table below shows the tasks that need to be performed, their task times, and preceding tasks.
\table[[Tasks,Description,Immediate Predecessor,\table[[Task Time],[(in seconds)]]],[A,Cut dress body,NONE,60],[B,Cut sleeves,NONE,90],[C,Cut collar,NONE,40],[D,Sew dress body,A,120],[E,Sew sleeves to dress,B, D,45],[F,Sew collar to dress,C, D,75],[G,Hem dress,D, E, F,70],[H,Package dress,G,100]]
a. Draw a precedence diagram that shows the precedence relationships among tasks for this assembly operation.
b. If 180 dressers are to be assembled in a 8-hour work day, what is the cycle time?
c. What is the minimum number of workstations required to balance this assembly line?
d. Assign tasks to workstations using the most-following-tasks rule as the primary rule and the ranked-positional-weight rule as the secondary (breaking tie) rule.
e. Compute the balance efficiency and percent delay (percent idle time).
 Problem 3 A dress-making operation is being designed as an assembly

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!