Question: Problem 3 A gas tungsten arc - welding operation is performed on low carbon steel. Voltage = 2 4 volts, current = 1 6 5

Problem 3
A gas tungsten arc-welding operation is performed on low carbon steel. Voltage =24 volts, current =165 amps , heat transfer factor =0.72, and melting factor =0.63. Filler metal wire of 4.0-mm diameter is added to the operation, so that the final weld bead consists of 65% filler and 35% base metal. If the travel speed in the operation is 6.0mmsec, determine (a) cross sectional area of the weld bead and (b) feed rate (mmsec) at which the filler wire must be supplied.
Problem 3 A gas tungsten arc - welding operation

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!