Question: Problem 3 A three - span concrete bridge structure is designed as shown below. The bridge deck is idealized as a continuous beam with one
Problem
A threespan concrete bridge structure is designed as shown below. The bridge deck is idealized
as a continuous beam with one end pinned to the ground and the other end fixed to the ground.
Two bridge piers are assumed to be fixed to the riverbed and support the deck.
The following parameters are obtained from the design:
Dimension:
;;;
Section bending stiffness: ; and
In the meantime, the deck from A to D is subject to an equivalent traffic load of
Use the moment distribution method to determine the resulting moment diagram
due to the traffic load.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock