Question: Problem 3 Design concrete sewer pipes for the storm sewer along maple Ave., between 8 th and 7 ' street ( CB - 1 to
Problem
Design concrete sewer pipes for the storm sewer along maple Ave., between th and street CB to CB and in and Gi street CB to CB as shown on the storm sewer layout map below. The return period for the design is year storm. The Manning roughness coefficient for the concrete pipe is The ground elevation and scale are given in ft in the layout map below. Assume all runoff from subbasin SB flows into catch basin CB Similarly, all runoff from subbasin SB flows into catch basin CB
tableSubbasin aArea
Can you please help me solve this question there is some math involved in it and this is not an exam question its homework problem