Question: Problem 3. The company Boston Dynamics is an engineering and robotics design company. Their design team have decided to start a secret project with the

Problem 3. The company Boston Dynamics is an engineering and robotics design company. Their design team have decided to start a secret project with the code name: The Marvel Initiatives. Their project consists of creating the new Iron Man suit. The design team is debating between choosing a pipelined or non-pipelined implementation. The table below includes design parameters for two possibilities of a pipelined and a non-pipelined iron man version. Iron Man Non-Pipelined Case 350 MHZ 1 Parameters Iron Man Pipelined Case Clock Rate 500 MHZ CPI for ALU Instructions 1 CPI for Control Instructions 2 CPI for Memory 2.7 Instructions 1 1 3.A) For the main program running in the iron man suit with 20% ALU instructions, 10% control instructions and 70% memory instructions, which design will be faster? Give a quantitative CPI average for each case. 3.B) For a program that runs Jarvis Al within the suit with 80% ALU instructions, 10% control instructions and 10% memory instructions, which design will be faster? Give a quantitative CPI average for each case
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts