Question: Problem 4 ( 7 0 pts ) : During the field trip, we observed the flow in the manmade rectangle concretes open channel ) =
Problem pts: During the field trip, we observed the flow in the manmade rectangle concretes open channel passing the gate over : slope first, then : slope, and adverse : slope to reach the retention pond as shown in the Figure below. When the flow rate per width is and the velocity of the water at the bottom of the point conditions will produce a hydraulic jump after the point and the depth in the channel at point is increased to be
Determine the water depth at point y and find the critical depth before the jump.
Find water depth at point y just before hydraulic jump
What type of water surface profile between points and determine the distance between point and using direct step method
determine energy loss between point to and point to in feet.
determine water depth y just before the gate if the head losses over the :: slope and : slope channel is ft of water
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
