Question: PROBLEM# 4 Using the attached drawing showing a Golf Cart Path, please answer the following questions: A . How much neat concrete will be required

PROBLEM#4
Using the attached drawing showing a Golf Cart Path, please answer the following questions:
A. How much neat concrete will be required (neat means no extra)? cubic yards
B. How much concrete is required if you add in 8% waste and then place an order with concrete dispatch (remember, orders must be placed in .25 cy increments) cubic yards
C. How many pounds of rebar do we need, assuming that we can order pieces without having to splice any rebar? pounds
D. How many pounds of rebar do we need if, due to logistics of the concrete work, the longest piece of rebar we can install is 14'-0"'? Hint, you have to refer to the splice length document.
pounds
Bonus question: If the concrete is $195 per cubic yard and the rebar is $.85 per pound, how much will the material total be for the amount of concrete in part B and the rebar in part C?(Assume there are no short load fees, winter protection, or anything like that and the $195? cy is inclusive of all necessary concrete extra costs) $
PROBLEM# 4 Using the attached drawing showing a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!