Question: Problem 5 - 2 3 Plantwide versus Multiple Predetermined Overhead Rates: Service Industry [ LO 2 , LO 3 , LO 5 ] McCullough Regional
Problem Plantwide versus Multiple Predetermined Overhead Rates: Service Industry LO LO LO
McCullough Regional Medical Centre uses a joborder costing system to assign costs to its patients. Its direct materials include a variety of items such as pharmaceutical drugs, heart valves, artificial hips, and pacemakers. Its direct labour costs eg surgeons, anesthesiologists, radiologists, and nurses associated with specific surgical procedures and tests are traced to individual patients. All other costs, such as depreciation of medical equipment, insurance, utilities, incidental medical supplies, and the labour costs associated with aroundtheclock monitoring of patients are treated as overhead costs.
Historically, McCullough has used one predetermined overhead rate based on the number of patientdoys each night that a patient spends in the hospital counts as one patientday to allocate overhead costs to patients. Recently a member of the hospital's accounting staff has suggested using two predetermined overhead rates allocated based on the number of patientdays to improve the accuracy of the costs allocated to patients. The first overhead rate would include all overhead costs within the Intensive Care Unit ICU and the second overhead tate would include all Other overhead costs. Information pertaining to the hospital's estimated number of patientdays, its estimated overhead costs, and two of its patientsPatient A and Patient Bis provided below.
tableEstimated number of patientdaws.,ICu,OtherEstimated fixed overhead cost,Estimated variable overhead cost oer natientdav,$$
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
