Question: Problem #5: What is the opportunity? (10 points total] Using the graph below, label the following areas by circling the red triangles where: 1. There

Problem #5: What is the opportunity? (10 points

Problem #5: What is the opportunity? (10 points total] Using the graph below, label the following areas by circling the red triangles where: 1. There is too much WIP 2. There is too little WIP 3. WIP is just right Then match each of the scenarios above with one of the following descriptions of results caused by the level of WIP: A. Bottleneck is starved causing lost throughput B. Cycle times are long because things are waiting in line C. Getting towards the ideal of Maximum Throughput with Minimum Cycle Time Flow Diagnostics Flow Benchmarking 25.000 0000 0 Throughput Each day Cycle Time days) ATHM ATH CT Best CTM CT current 5.000 000 0 000 2,000 .000 7900 ,000 ,000 3,000 ,000 .000 Work in Process Each WIP is a design parameter for flow performance

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!