Question: PROBLEM 6: Dras the Network Diagram and determine the Critical Path and duration of the project (in das). Activity Duration (days) Predecessor s) C.D C.D
PROBLEM 6: Dras the Network Diagram and determine the Critical Path and duration of the project (in das). Activity Duration (days) Predecessor s) C.D C.D FG Task Duration in Weck 123 4 5 67 89 10 1 12 13 14 15 16 17 18 19 2021 2223 24 25 26 27 28 29 30 10
Step by Step Solution
There are 3 Steps involved in it