Question: Problem 6.31 Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through

 Problem 6.31 Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs,Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles. Each framepasses through three processes: Cutting, Welding, and Painting. In September, the Cutting

Problem 6.31 Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: a. In Cutting, all direct materials are added at the beginning of the process. b. Beginning work in process consisted of 40,500 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000; direct labor, $222,600; and applied overhead, $150,000. c. Costs added to production during the month were direct materials, $2,565,000; direct labor, $3,471,150. Overhead was assigned using the following information: Activity Actual Driver Usage Rate Inspection $150 per inspection hour 4,000 inspection hours Maintenance $750 per maintenance hour 1,600 maintenance hours Receiving S300 per receiving order 2,000 receiving orders d. At the end of the month, 121,500 units were transferred out to Welding, leaving 13,500 units in ending work in process, or 25 percent complete

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!

Q:

\f