Question: Problem 7 in Niebel's Methods, Standards, & Work Design, 13th edition How many machines should be assigned to an operator for lowest-cost operations when: Loading

Problem 7 in Niebel's Methods, Standards, & Work Design, 13th edition

How many machines should be assigned to an operator for lowest-cost operations when:

Loading and unloading time on one machine is 1.41 min.

Walking time to the next facility is 0.08 min.

Machine time (power feed) is 4.34 min.

Operator rate is $13.20/h.

Machine rate is $18.00/h

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!