Question: Problem 7-1 An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 11.0 minutes, and the standard deviation was
Problem 7-1
An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 11.0 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rating of 133 percent. Assume an allowance of 19 percent of job time. Find the standard time for this operation.(Do not round intermediate calculations.Round your finalanswer to 2 decimal places.)
Standard timeminutes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
