Question: Problem 8 . 1 5 The following hydrographs ( f t 3 s ) are for the upstream ( I ) and downstream ( O

Problem 8.15
The following hydrographs (ft3s) are for the upstream (I) and downstream (O) sections of a river. Estimate the routing coefficient C of the Convex Routing method.
\table[[I(ft3s),0,210,530,840,920,870,610,380,190,80,40,20],[O(ft3s),0,10,90,230,480,620,710,690,540,440,270,190]]
Problem 8.19
Route the hydrograph of Problem 8.10 using the Muskingum method with x=0.25,K=0.75, and t=0.25. Assume that the initial discharge at the downstream section is 0ft3s.
"Referencing 8.10"
Problem 8.10
Assuming that C=0.25, compute the downstream hydrograph using the Convex method for the following upstream hydrograph: (0,12,27,56,53,47,38,23,15,8,4,0)ft3s. Assume that the initial discharge at the downstream section is 0ft3s.
Problem 8.22
Assuming a routing time increment, t, of 15 minutes, determine values of the routing coefficients x and K for the Muskingum method and the hydrographs of Problem 8.15.
Problem 8.30
A surface-storage facility has a rectangular bottom
Problem 8 . 1 5 The following hydrographs ( f t 3

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!