Question: Problem 9.16 Question Help Fig. 1 The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum

Problem 9.16 Question Help Fig. 1 The following

Problem 9.16 Question Help Fig. 1 The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 10 minutes. Q - Q Activity Activity Description and Performance ( Attach wheels to tub 5.0 B Attach motor to lid 1.6 Attach battery pack 2.8 D Attach safety cutoff 3.6 E Allach filters 3.0 F Attach lid to tub 2.0 G Assemble 2.8 attachments H Function test 3.5 1 Final Inspection 2.0 J J Packing 2.0 B B A, E Fig. 2 - D. F,G H 1 1 a-b) One of the possible assignment of tasks to workstations is shown Correctly in Fig. 3 @ Fig. 1 Fig. 3 Fig. 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!