Question: Problem 9.16 Question Help The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The

Problem 9.16 Question Help The following table

Problem 9.16 Question Help The following table

Problem 9.16 Question Help The following table

Problem 9.16 Question Help The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 10 minutes. Fig. 1 D - Activity Activity Description Time (mins) Performance Predecessors A Attach wheels to tub 5.0 B Attach motor to lid 1.5 C Attach battery pack 3.0 B D Attach safety cutoff 4.0 E Attach filters 3.0 B F Attach lid to tub 2.0 A, E G Assemble 3.0 attachments H Function test 4.0 D, F, G 1 Final inspection 2.0 H J Packing 2.0 1 Fig. 2 a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2 Fig. 3 The efficiency of the assembly line with 3 workstations =% (enter your response rounded to two decimal places) c) Is this possible to increase the efficiency to 100%? d) What is the theoretical minimum number of workstations

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!