Question: Problem: Excavation, Backfill, and Cost Calculation for a Building Foundation You are tasked with calculating the total costs associated with excavating a foundation for a

Problem: Excavation, Backfill, and Cost Calculation for a Building Foundation
You are tasked with calculating the total costs associated with excavating a foundation for a building, the haul-off of excess soil, and the cost of the concrete to fill the foundation. You need to consider the following details:
Given Information:
Foundation Dimensions:
Length =300 feet
Width =200 feet
Depth =4 feet
Slope ratio for excavation sides =1.5:1(horizontal to vertical)
Material and Operation Costs:
Excavation cost: 5 USD per cubic yard (BCY)
Haul-off cost: 10 USD per cubic yard (LCY)
Concrete cost: 150 USD per cubic yard (BCY)
Load Factor (LF)=0.70: This accounts for the soil expanding when excavated.
Swell Factor (SF)=10%: This represents soil shrinkage when backfilled.
Tasks:
Calculate the total excavation volume (including slopes).
Determine the backfill volume.
Calculate the haul-off volume.
Compute the total project costs for excavation, haul-off, and concrete.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!