Question: Problem: Excavation, Backfill, and Cost Calculation for a Building Foundation You are tasked with calculating the total costs associated with excavating a foundation for a
Problem: Excavation, Backfill, and Cost Calculation for a Building Foundation
You are tasked with calculating the total costs associated with excavating a foundation for a building, the hauloff of excess soil, and the cost of the concrete to fill the foundation. You need to consider the following details:
Given Information:
Foundation Dimensions:
Length feet
Width feet
Depth feet
Slope ratio for excavation sides :horizontal to vertical
Material and Operation Costs:
Excavation cost: USD per cubic yard BCY
Hauloff cost: USD per cubic yard LCY
Concrete cost: USD per cubic yard BCY
Load Factor LF: This accounts for the soil expanding when excavated.
Swell Factor SF: This represents soil shrinkage when backfilled.
Tasks:
Calculate the total excavation volume including slopes
Determine the backfill volume.
Calculate the hauloff volume.
Compute the total project costs for excavation, hauloff, and concrete.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock