Question: PROBLEM: ( Refer to sketch # 1 ) GIVEN: Influent Elevation of M . H . A - 1 = 1 3 9 . 2

PROBLEM: (Refer to sketch #1)
GIVEN:
Influent Elevation of M.H. A-1=139.20'
Effluent Elevation of M.H. A-2=146.60
Influent Elevation of M.H. A-2=146.90'
Effluent Elevation of M.H. A-3=147.72'
Bottom of M.H. diameters =4.00'
Standard distance from batterboards to invert is as follows:
M.H.A-1toA-2=10.00'
M.H.A-2toA-3=10.00'
Hub offset is 8.00' for M.H. A-1 to A-2 and 10.00' for M.H. A-2 to A-3. The
length of the batterboards is 10.00'.
PROBLEM:
Complete the attached set of surveying notes for sewer line construction
staking.
a. Draw the plan of the sewer line on engineering paper at a scale of
1''=40.00'.
b. Indicate the manholes, the centerline of the sewer line, the location of the
hubs, the batterboards and the stations. Note the hub offsets and the
stations at each point.
PROBLEM: ( Refer to sketch # 1 ) GIVEN: Influent

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!