Question: Problem S7.15 A production process Kenneth Day Manufacturing is shown in the figure below. The driling operation cours go through only one of the three

Problem S7.15 A production process Kenneth Day
Problem S7.15 A production process Kenneth Day Manufacturing is shown in the figure below. The driling operation cours go through only one of the three assembly operations (the operations are in parallell partly from, and simultaneously , the song and sanding, which are independent person. A product needs to aj Westing the bottlenec The be s t per un found your