Question: PROBLEMS 1 . The floor system in Figure 8 - 2 2 sits on a redwood sill on a concrete wall. Determine the number of

PROBLEMS1. The floor system in Figure 8-22 sits on a redwood sill on a concrete wall. Determine the number of16-foot-long pieces of redwood that are needed to complete the floor system.2. Determine the materials needed to complete the posts and girder supporting the floor joists in Figure 8-22. The posts are connected to footings using a Simpson PB44 post base and are connected146CHAPTER EIGHTto the girder using a Simpson BC4 post cap. The distance between the top of the footing and the bottom of the girder is 7 feet. The posts are spaced 12 feet apart.3. Determine the materials needed to construct the joists and joist headers for the floor system shown in Figure 8-22.4. For the floor system shown in Figure 8-22, the joists are blocked over the girder, at the concreteDOUBLE JOSTwall at the overhang, and at the midpoint between the girder and the exterior wall on the joists over 8 feet long. Determine the materials needed for the blocking.5. Determine the number of 4-foot by 8-foot sheets of23/32-inch T&G OSB sheathing that are needed to construct the floor system shown in Figure 8-22.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!