Question: PROBLEMS: Assume the following information. table [ [ Probability of failure,Consequences of failure ] , [ Maturity = , 0 . 4 7 ,
PROBLEMS:
Assume the following information.
tableProbability of failure,Consequences of failureMaturityCost Complexity Schedule Dependancy Reliability Performance,
Calculate the overall risk factor and assess the level of risk for this project. Method: Excel, Points: