Question: Process 1 has n=21, variance 0.15 Process 2 has n=25, variance 0.33 A batteries manufacturer uses two different production processes 1 and 2 . There
Process 1 has n=21, variance 0.15
Process 2 has n=25, variance 0.33
A batteries manufacturer uses two different production processes 1 and 2 . There is some degree of variability (in voltage), and an engineer claims that process 1 is better (in the sense of having smaller variance) than process 2, there are two samples taken, test the engineer's claim at the 5% level of significance.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts