Question: Process quality control is measured by sampling 10 items each day over a seven-day period. The overall mean of the items sampled is 9.3 with

Process quality control is measured by sampling 10 items each day over a seven-day period. The overall mean of the items sampled is 9.3 with a standard deviation of 2.1. What is the standard error of the process?

Assuming a Z-score of 1.96, what are the upper and lower control limits for the process?

The goal is for the item to be 9 with an acceptable tolerance of 0.5. What are Cp and Cpk?

A new manufacturing method is introduced. It takes 200 seconds to make the first item and they expect to be on an 80% learning curve. How long will it take to make the 25th item?

A second new method is introduced. It takes only 180 seconds to make the first item and 30 seconds for the 150thitem. What is b in their learning curve formula?

A third new method takes 220 seconds for the first item and 120 seconds for the 400th item. What is the rate of learning?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!