Question: Process quality control is measured by sampling 10 items each day over a seven-day period. The overall mean of the items sampled is 9.3 with
Process quality control is measured by sampling 10 items each day over a seven-day period. The overall mean of the items sampled is 9.3 with a standard deviation of 2.1. What is the standard error of the process?
Assuming a Z-score of 1.96, what are the upper and lower control limits for the process?
The goal is for the item to be 9 with an acceptable tolerance of 0.5. What are Cp and Cpk?
A new manufacturing method is introduced. It takes 200 seconds to make the first item and they expect to be on an 80% learning curve. How long will it take to make the 25th item?
A second new method is introduced. It takes only 180 seconds to make the first item and 30 seconds for the 150thitem. What is b in their learning curve formula?
A third new method takes 220 seconds for the first item and 120 seconds for the 400th item. What is the rate of learning?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
