Question: Process quality control is measured by sampling 10 items each day over a seven-day period. The overall mean of the items sampled is 9.3 with
Process quality control is measured by sampling 10 items each day over a seven-day period. The overall mean of the items sampled is 9.3" with a standard deviation of 2.1." What is the standard error of the process?
Assuming a Z-score of 1.96, what are the upper and lower control limits for the process?
The goal is for the item to be 9" with an acceptable tolerance of 0.5." What are Cp and Cpk?
A new manufacturing method is introduced. It takes 200 seconds to make the first item and they expect to be on an 80% learning curve. How long will it take to make the 25th item?
A second new method is introduced. It takes only 180 seconds to make the first item and 30 seconds for the 150thitem. What is b in their learning curve formula?
A third new method takes 220 seconds for the first item and 120 seconds for the 400th item. What is the rate of learning?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
