Question: Project Title: Apply knowledge of inventory control, scheduling and queuing and simulation of the manufacturing environment. Project Overview: In this group project, a team of

Project Title: Apply knowledge of inventory control, scheduling and queuing and simulation of the
manufacturing environment.
Project Overview:
In this group project, a team of four students will develop a simulation model of a manufacturing
plant using software tools (e.g., MATLAB, ABC inventory, or ERPnxt). The project will involve
analyzing and optimizing inventory control, production scheduling, and queuing processes to
improve the overall efficiency and productivity of the manufacturing plant. The project is computer-
based and requires significant computational and analytical work.
Group Structure and Task Allocation:
Each group member will take the lead on one major task and contribute to the final report and
presentation. The tasks are designed to ensure collaboration and integration of different
components into a unified simulation model.
Project Tasks and Evaluation Criteria:
Task 1: System Design and Data Collection (20 marks)
Lead: Student 1
Objective: Design a virtual manufacturing system and collect necessary data.
Description:
1. Define the layout of a hypothetical manufacturing plant, including production lines,
workstations, and storage areas.
2. Identify types of products, production processes, and inventory types.
3. Collect data related to production rates, processing times, demand rates, and inventory
costs.
4. Represent the system diagrammatically (flowcharts or schematic diagrams).
5. Deliverables: Detailed system design document and data collection report.
6. Collaboration: All group members should contribute to the design discussion and data
collection.
MG6044/DE6310 Semester 12024
Manufacturing Processes & Production Assignment 4 Page 4
Task 2: Inventory Control Analysis (20 marks)
Lead: Student 2
Objective: Develop and implement an inventory control model.
Description:
1. Choose an inventory control model (e.g., EOQ, Just-In-Time, ABC analysis).
2. Implement the model using software tools to optimize inventory levels.
3. Analyze how inventory control decisions affect overall costs and availability.
4. Provide visualizations (graphs, charts) of inventory levels over time.
5. Deliverables: Inventory control model implementation, analysis report, and visualizations.
6. Collaboration: Student 1 provides necessary data, and all members review and provide
feedback.
MG6044/DE6310 Semester 12024
Manufacturing Processes & Production Assignment 4 Page 5
Task 3: Production Scheduling (20 marks)
Lead: Student 3
Objective: Create an optimized production schedule.
Description:
1. Develop a scheduling model to allocate resources and time slots to different production
tasks.
2. Use algorithms (e.g., Gantt charts, critical path method) to optimize the schedule.
3. Consider constraints such as machine availability, labor shifts, and maintenance periods.
4. Compare the efficiency of different scheduling strategies.
5. Deliverables: Production scheduling model, comparative analysis, and scheduling charts.
6. Collaboration: Student 1 provides system layout; Student 2 provides inventory constraints.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!