Question: Provide a flowchart for the following: a . Load castings into cell - from buffer with capacity of four b . Machine gasket mounting flange
Provide a flowchart for the following:
a Load castings into cell from buffer with capacity of four
b Machine gasket mounting flange on casting
c Inspect flange for planarity
i Rejected castings will be returned to Machining center and re machined
and then returned to process flow
d Transfer good casting to valve body assembly station where valve body is assembled to casting in sequence.
e Electrically test the assembly
i fail inspection and are scrapped
ii Scrapped parts transported on a scrap conveyor and then pushed to scrap
iii. The electrical testing machine breaks down every to units with uniform probability, repair time is minutes on average with standard deviation.
f Transport to the packing station on a curved or shaped conveyor. A conveyor should start at unit of height and end at units of height.
g Pack and Ship assemblies
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
