Question: Provide a flowchart for the following: a . Load castings into cell - from buffer with capacity of four b . Machine gasket mounting flange

Provide a flowchart for the following:
a. Load castings into cell - from buffer with capacity of four
b. Machine gasket mounting flange on casting
c. Inspect flange for planarity
i. Rejected castings will be returned to Machining center and re- machined
(7.37%) and then returned to process flow
d. Transfer good casting to valve body assembly station where valve body is assembled to casting in sequence.
e. Electrically test the assembly
i.1.25% fail inspection and are scrapped
ii. Scrapped parts transported on a scrap conveyor and then pushed to scrap
iii. The electrical testing machine breaks down every 27 to 34 units with uniform probability, repair time is 9 minutes on average with 1.28 standard deviation.
f. Transport to the packing station on a curved or "L" shaped conveyor. A conveyor should start at 1 unit of height and end at 1.25 units of height.
g. Pack and Ship assemblies
Provide a flowchart for the following: a . Load

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!