Question: Provide a report for a project about Culvert in general, the report should include the following information ( assume the number reasonably) 1-what are the

Provide a report for a project about Culvert in general, the report should include the following information ( assume the number reasonably)

1-what are the demands for culvert

2-make a cost Flow

3-Job costing

  1. Identify the Job that is the Chosen Cost Object
  2. Identify the Direct Costs of the Job
  3. Select the Cost-Allocation base(s) to use for allocating Indirect Costs to the Job
  4. Match Indirect Costs to their respective Cost-Allocation base(s)
  1. Calculate an Overhead Allocation Rate:
    • Actual OH Costs ÷ Actual OH Allocation Base
  1. Allocate Overhead Costs to the Job:
    • OH Allocation Rate × Actual Base Activity For the Job.
  1. Compute Total Job Costs by adding all direct and indirect costs together

4-Find the activity-based costing for culvert

  • Identify and classify the activities involved in the manufacture of specific products, and allocate overhead to cost pools.
  • Identify the cost driver that has a strong correlation to the costs accumulated in the cost pool.
  • Compute the activity-based overhead rate for each cost driver.
  • Assign overhead costs to products, using the overhead rates determined for each cost pool (cost per driver).

5-then Find the breakeven analysis point for culvert

Step by Step Solution

3.40 Rating (150 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Culverts are oneofakind structures that play an important role in todays infrastructure Many of them are currently in disrepair or have restricted usefulness Others are hydraulically obsolete because ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!