Question: Q 1 . A batch settling test has been performed on an industrial wastewater having an initial suspended solid of 5 9 7 m g
Q A batch settling test has been performed on an industrial wastewater having an initial suspended solid of
to develop criteria for the design of a primary clarifier. The test column was in diameter and high,
and sampling ports were located and from the water surface in the column. The suspended solids
remaining after various sampling times are given in table below. The wastewater flow is MGD Determine:
a The design overflow rate and detention time if of the suspended solids are to be removed. Use scale
up factors of for the overflow and for the detention time.
b The diameter if a circular clarifier is used
c The design diameter of the clarifier if equipment is available in ft increments
d The depth of the tank
Depth, ft Time, min
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock