Question: [ 4 0 ] 4 . A batch settling test has been performed on an industrial wastewater having an initial suspended solids of 5 9
A batch settling test has been performed on an industrial wastewater having an initial suspended solids of to develop criteria for the design of a primary clarifier. The test column was in diameter and high, and sampling ports were located and from the water surface in the column. The suspended solids remaining after the various sampling times are given below:
tableDepth ftTime min
The wastewater flow is MGD
Determine:
a The design overflow rate and detention time if percent of the suspended solids are to be removed. Use scaleup factors: for overflow rate and for detention time.
b The diameter if a circular clarifier is used.
c The design diameter if equipment is available in ft increments of tank diameter.
d The depth of the tank.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock