Question: Q 2 : Consider a 3 by 3 pile group in a layered saturated clayey soil, as shown in Figure 2 . The solid piles
Q: Consider a by pile group in a layered saturated clayey soil, as shown in Figure The solid piles are circular in cross section and have the same diameter D of mm The pile centretocentre spacing, d is mm The pile group is designed to support a vertical downward load of kN Assume the lumpsum factor of safety for the loadbearing capacity of the pile group is
Total: marks
a Determine the vertical loadbearing capacity of an individual pile in undrained conditions.
marks
b Determine the vertical loadbearing capacity of the pile group in undrained conditions by assuming that the piles in the pile group acts as a block with dimension Lgtimes Bgtimes L
marks
c Does the pile group have sufficient loadbearing pile group capacity to support the vertical load?
marks
d To carry out pileloadingtests on driven piles in clays, why should the pileloadingtests be carried out at least a month after the pile installation?
marks
e List two disadvantages of bored piles in comparison to driven piles.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock