Question: Q 3 - 8 : A 1 5 - meter wide 2 5 km long highway is to be constructed between two towns. The highway
Q: A meter wide km long highway is to be constructed between two towns. The highway is required to take msa of loading over its design life of years. The CBR of the native soil where the highway is to be built is Sketch a design for the various layers of your pavement to fulfil this design brief. When producing your design, you should consider the fact that the subbase available from the supplier for this job costs $ per mathrmm and local capping material is also available for $ per mathrmm Marks