Question: Q 4 5 . During the traffic study, 2 5 vehicles pass at a point on a highway in a span of 1 2 minutes.

Q45. During the traffic study, 25 vehicles pass at a point on a highway in a span of 12 minutes. The traffic flow is most nearly
a.90 vehicles per hour
b.125 vehicles per hour
c.135 vehicles per hour
d.190 vehicles per hour
Q46. The method of considering more than the initial cost of a facility is called
a. Annual Costing
b. Carbon emission average Costing
c. Modified Initial Costing
d. Life-cycle Costing
Q47. A steel bar is pulled by a 300KN axial force. If the bar is 13 m long and has a diameter of 3 cm , its elongation (Young's Mod. of Steel E=200GPa ) is most nearly
a.,1mm
b.,2mm
c.,10mm
d.,27mm
Q 4 5 . During the traffic study, 2 5 vehicles

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!