Question: Q . Consider a 6 - machine flow line where a single job goes through in batches of 1 0 0 units. times ( in
Q Consider a machine flow line where a single job goes through in batches of units.
times in sec
i What is the makespan cycle time of a single batch no splitting
ii What will be the makespan of units coming out of this line if the original lot
is split into two equal sublots and processed on these machines simultaneously?
iii. What are the optimal sublot sizes for minimizing the makespan given that we
will split the original lot into two not necessarily equal sublots?
iv If in the process of splitting the lot into two sublots an additional restriction is
placed on the size of each sublot, for example, no less than units should be in
each sublot, how will you include this constraint into your solution?
v Apply your procedure for part iv to calculate the new optimal sublot sizes under
this constraint.
vi What would be the makespan if you were to split the lot into three equal sublots
and
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
