Question: Q1. Consider the following cost and time data for a construction project. a) (5 points) Draw AON representation of the project network. b) ( 20

Q1. Consider the following cost and time data for a construction project. a) (5 points) Draw AON representation of the project network. b) ( 20 points) Find the critical path and the total cost of the project. c) (10 points) Build the Gant chart of the project. d) (20 points) The gain is $175 for each day the project finishes earlier than its contracted duration found in part (a). Find the activities that should be expedited and the new schedule for the project. Follow the steps of the procedure in the lecture notes. Q1. Consider the following cost and time data for a construction project. a) (5 points) Draw AON representation of the project network. b) ( 20 points) Find the critical path and the total cost of the project. c) (10 points) Build the Gant chart of the project. d) (20 points) The gain is $175 for each day the project finishes earlier than its contracted duration found in part (a). Find the activities that should be expedited and the new schedule for the project. Follow the steps of the procedure in the lecture notes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts