Question: Q1. Given the product structure, master production schedule, and inventory status in the Figure below and assuming the requirements for each BOM item is 1:

Q1. Given the product structure, master

Q1. Given the product structure, master production schedule, and inventory status in the Figure below and assuming the requirements for each BOM item is 1: a) develop a gross requirements plan for Item C; b) develop a net requirement plan for Item C Master Production Schedule for X1 PERIOD 7 8 9 10 11 12 Subassembly X1 Gross requirements 50 20 100 B11) B212 LEAD TIME ON HAND LEAD TIME ON HAND ITEM ITEM A11) E11) C2) D(1) X1 B1 B2 Al 1 2 2. 1 50 20 20 5 D E 1 1 3 0 0 10 E2)