Question: Q1. To complete the engine assembly for a prototype Hydrogen Proton SUV, the Operation Manager has laid out eight major activities involved. These activities have

Q1. To complete the engine assembly for a

Q1. To complete the engine assembly for a prototype Hydrogen Proton SUV, the Operation Manager has laid out eight major activities involved. These activities have been labeled from A through H in the following table below, which also show their estimated completion times (in weeks) and immediate predecessors. Construct an AON and answer the questions that follow. [ 25 marks] a m Duration Activity Predecessor Optmistic Most Likely Pesismatic Expected Time Variance b t o? A 1 2 3 B 2 3 4 A, B 1 2 3 D 2 4 6 E C 1 4 7 F D 1 2 9 G E, F 3 4 11 H G 1 2 3 (5marks) (5marks) a) Construct an Activity on Node (AON) project network diagram. b) Find the expected time (duration) for each activity c) Find the variance of each activity d) Calculate the scheduling time and slack time for each activity. e) Find critical path activities and project duration (5marks) (5marks) (5marks)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!