Question: Q2. Using the linear program encoded below in the GAMS program, code the model to solve in LINDO program and show lindo output. Sett time

Q2. Using the linear program encoded below in the

Q2. Using the linear program encoded below in the GAMS program, code the model to solve in LINDO program and show lindo output. Sett time week) /1*4/ Scalars rhe worker productivity (unit per worker) / 8 / wage (weekly and pex worker TL) / 1007 Parameter the initial inventorx (unit) /1 10/ wilt) the initial number of worker (worker) /1 20/ d(t) the demand (unit) /1 100, 2 200, 3300, 4 400/ Positive Variables r(t) the number of product at timet (unit) the number of inventory at time t (unit) ut) the number of unsatisfied demand at time t (unit) wit) the number of worker at time t (worker) h(t) the number of recruited worker at time t (worker) f(t) the number of fired worker at time t (worker) Variables phi the total cost (TL) Equations sk(t) product balance. (unit) wbit) worker balance - time passes (zaman geileri) (worker) wd(t) worker balance - used in production (uretimde kullanm) (worker) abi obiective function (TL); sbt).. s(t) == s(t-1)+p(t) - det) - u(t-1) + u(t) + si(t): wo(t). w(t)=e=w(t-1)-f(t) +h(t) + wit); wdct). u(t) =g=P(t)the ski phi =e= sum(t, 10*s(t) + 30*u(t) + wage * w(t) + 125*(h(t)=f(t))); Model jobs iek training model/all/; Selve jobs minimizing phi using lp: Note *g=>> =e= = sl= Q2. Using the linear program encoded below in the GAMS program, code the model to solve in LINDO program and show lindo output. Sett time week) /1*4/ Scalars rhe worker productivity (unit per worker) / 8 / wage (weekly and pex worker TL) / 1007 Parameter the initial inventorx (unit) /1 10/ wilt) the initial number of worker (worker) /1 20/ d(t) the demand (unit) /1 100, 2 200, 3300, 4 400/ Positive Variables r(t) the number of product at timet (unit) the number of inventory at time t (unit) ut) the number of unsatisfied demand at time t (unit) wit) the number of worker at time t (worker) h(t) the number of recruited worker at time t (worker) f(t) the number of fired worker at time t (worker) Variables phi the total cost (TL) Equations sk(t) product balance. (unit) wbit) worker balance - time passes (zaman geileri) (worker) wd(t) worker balance - used in production (uretimde kullanm) (worker) abi obiective function (TL); sbt).. s(t) == s(t-1)+p(t) - det) - u(t-1) + u(t) + si(t): wo(t). w(t)=e=w(t-1)-f(t) +h(t) + wit); wdct). u(t) =g=P(t)the ski phi =e= sum(t, 10*s(t) + 30*u(t) + wage * w(t) + 125*(h(t)=f(t))); Model jobs iek training model/all/; Selve jobs minimizing phi using lp: Note *g=>> =e= = sl=

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!