Question: Q3 (a) Work sampling is one of the common methods used to calculate and study the capacity and productivity of an assembly line. Table Q3(a)

Q3 (a) Work sampling is one of the common methods

Q3 (a) Work sampling is one of the common methods used to calculate and study the capacity and productivity of an assembly line. Table Q3(a) shows the data collected during a work sampling study at a children furniture final assembly line. The work sampling was conducted for a total of 4 days. Each day, the plant was operating for 8 working hours and overall a total of 192 observations were conducted over the period of 4 days. The factory is currently employing 34 workers with the average monthly salary of RM 1250 per person. The management is looking forward to reduce the number of workers by using industrial engineering concept. Evaluate the given information and propose a suitable standard time for the final assembly process. (5 marks) Table Q3(a): Work sampling data Item Data Production in progress 168 observations Production is stopped due to various reasons 24 observations Total output over 4 days study 1850 units Factory rating during the study 90% Time study allowance 15%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!