Question: Q4 please QUESTION 3 A robotic welding coll is being proposed. It will use a robot to do the welding, and a person to load

Q4 please QUESTION 3 A robotic welding coll is
Q4 please QUESTION 3 A robotic welding coll is
Q4 please
QUESTION 3 A robotic welding coll is being proposed. It will use a robot to do the welding, and a person to load and unload the parts from their fixtures. To minimize waiting time, two fixtures will be used the person can unload and reload one fixture at the same time that the robot is welding another part in the other fixture. The activities in the work cycle Time 5.2 minutes Activity Person: unload finished part, then load next part Robot Weld current part Robot: Reposition to other fixture 50 minutes 10 minute Assume that the person never needs a break, and that the robot has an availability of 98%. Also assume that the robot must be reloaded with fresh welding rods after every 40 parts, which will require 20 minutes. Find the average hourly production rate for this cell. a 6.5 6.5.2 0.7.3 QUESTION 4 If the cycle time in the previous question had come out to 7.0 minutes, what is the hourly production rate for this cell? a. 7.5 6.79 C. 8.9 0.8.2 e. 8.4 Click Save and Submit to save and submit. Click Save All Answers to save all answers

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!