Question: quatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing.

quatica makes underwater camera housings for
quatica makes underwater camera housings for
quatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing. A Computer Numerically Controlled (CNC) machine drills into the block to make the metal "frame" of the ousing Each block requires 15 minutes of drilling. The frame is then chemically treated in a series of baths. There is ample capacity in me treating stage. Finally, a worker must manually attach the various buttons and components to the metal housing. This assembly kes 120 minutes per housing per worker and Aquatica has 6 workers trained to do this task. The CNC machine requires a 30-minute tup time before the production of a batch can begin. Housing Type D7000 5DS Mark 111 AN-5n D300 T21 Demand Rate (housings per hour) 0.4 0,5 0.6 0.7 0.8 Answer is complete but not entirely correct. a. b. C d If the CNC machine produces 35 housings between setups, what would be its capacity (in housings per hour)? (Round your final answer to nearest whole number) Assuming the process is supply constrained, what is the utilization (as a percentage) of the CNC machine if it operates in batches of 35 housings? (Round your answer to 2 decimal places.) Assuming the process is supply constrained and operates with batches of 35 housings, what is the average inventory of housings? Aquatica actually makes 5 different housings. As already mentioned, the CNC machine must be set up whenever production switches from one housing to the other. In each case, the setup time is 30 minutes and it takes 15 minutes to drill the block for each type of housing. Demands for the housings are given in the table above. If it wish to minimize inventory while satisfying its demand, how many D7000 housings should it produce in each batch? 3.1 90 1.22 housings per hour % 7x number of housings number of housings

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!