Question: Que 2.- The table below shows set of activity with duration and resources. Insert a project buffer and feeding buffers as required. (a) Indicate the
Que 2.- The table below shows set of activity with duration and resources. Insert a project buffer and feeding buffers as required. (a) Indicate the critical chain and how it's different from critical path. (b) Which of the resources are the constraint? (c) Develop alternative critical chains for this problem based on resource constraint. ACTIVITYDESCRIPTION (FROMVBS) ACTIV PNsign Subsystem A Manufactury Subsystem A Tost suby storm A Design Subsystem B Build Subsy stom D Assemble Subsystems A and B 2020-N CODE DURATION (DAYS) 404787 RESOURCES Design Team A Technician Test team Design Team B Technician Technician (5)
Que 2. - The table below shows set of activity with duration and resources. Insert a project buffer and feeding buffers as required. (a) Indicate the critical chain and how it's different from critical path. (b) Which of the resources are the constraint? (c) Develop altemative critical chains for this problem based on resource constraint
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock