Question: Question 1 (1 point) Batch size (pairs) Total time per batch (min) Setup time + Production time 5 100 + 4 * 5 = 120

Question 1 (1 point) Batch size (pairs) TotalQuestion 1 (1 point) Batch size (pairs) Total

Question 1 (1 point) Batch size (pairs) Total time per batch (min) Setup time + Production time 5 100 + 4 * 5 = 120 Capacity (pairs/ Batch size / time per bi 5/120 = 0.042 [pair/ = 2.5 [pair 25/200 = 0.125 (pair/ = 7.5 (pair 25 100 + 4* 25 = 200 50 Blank A Blank B 150 Blank C Blank D Using the attached table, fill in Blank A, B, C, and D. Keep two decimals if required. Blank A: A Blank B: A/ [pair/hour). Blank C: A Blank D: A [pair/hour]. Keep two decimals. Question 2 (1 point) Now consider door production for a sedan, i.e., 1 set contains 4 types of doors; 2 min to produce a door. It still takes 50 minutes to configure the machine when changing type Flow unit: a set of 4 doors Capacity [set/hour] and designed cycle time (CT) in [minute/set]: Keep two decimals if required. If using a batch size of 25 sets: Capacity = A [set/hour] CT = [min/set]. if using a batch size of 100 sets: Capacity = [set/hour]. CT = [min/set]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!