Question: Question 1 [10] Write a paragraph explaining what is meant by the statement Systems engineering is focused on the system as a whole. State what

Question 1 [10] Write a paragraph explaining whatQuestion 1 [10] Write a paragraph explaining what

Question 1 [10] Write a paragraph explaining what is meant by the statement Systems engineering is focused on the system as a whole." State what characteristics of a system you think this statement implies and how they apply to systems engineering Question 2 [10] Pick a product, describe the enabling system that is required to bring it into being, and explain the importance of engineering the system and product together. Question 3 [10] Compare and contrast with aid of examples a product life cycle and a system life cycle Question 4 [10] Select a system of your choice and develop a detailed outline of a SEMP for your system [6] Question 5 Create a Work Breakdown Structure for the system in question 4 Question 6 [24] Isaacs Motors manufacture components for the Ford Ranger and supply the components to the Ford Motor Company Assembly Plant in Silverton. According to the company CEO Mr Isaac Motlhakudi the company is developing new parts for the next generation Ford Ranger and are trying to optimize their production capabilities. The activities necessary to the parts for the next generation Ford Ranger and related data are given in the following table: Activity time Normal cost Crash Time Crash Cost Activity Immediate (weeks) (R) (Weeks) (weeks) Predecessor(s) 3 1000 2 1600 A B 2 2000 1 2700 1 300 1 300 D 7 1300 3 1600 A E 6 850 3 1000 B F 2 4000 1 5000 G 4 1500 2 2000 D, E a) Create the AON network for the activities [7] F 2 1 5000 C 4000 1500 G 4 2 2000 D, E a) Create the AON network for the activities [7] INGM315 Paper No Nraestel Nr. 1 | Assignment 1/ Opdrag 1 |/Full-time/Voltyds/ 4/2 b) What is the project completion date? c) Crash this project to 10 weeks at the least cost. d) Crash this project to the minimum number of weeks possible at the least cost [5] [5] [7] Question 5 [101 7. The table below shows tasks in a building project. Use the Design Matrix Structure approach to optimize the sequence of the tasks.) 13 1 2 3 4 5 6 7 8 9 10 11 12 1 2 X X X X 3 4 X 5 X 6 X 7 8 9 X X X X X 10 11 12 13 END OF ASSIGNMENT 1 TOTAL: 80 Fle reference: 8.1.7.2.2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!