Question: Question # 1 ( 3 pts . ) : A nearby reservoir is planned to be held back temporarily during construction by a 6 0

Question #1(3 pts.):
A nearby reservoir is planned to be held back temporarily during construction by a 60-foot-long (the dimension into and out of the page) sheet pile retaining wall, as seen in the figure at right. Based on the given info:
a) What will the annual overall seepage rate of the water below the retaining wall?
b) What will the annual loss of water down into a 28,000ft2 area of the groundwater
lopetwowstes table be?