Question: QUESTION 7 A buttress dam wall must be designed for storage and erosion control on a farm in the Free State. To do the design,

QUESTION 7
A buttress dam wall must be designed for storage and erosion control on a farm in the Free State. To do the design, the design peak discharge/ runoff must be determined for a 1: 50-year flood. Determine the peak discharge by making use of the Rational method and the data listed in Table 1.
The following information is available:
- Catchment area:
\[
28\mathrm{~km}^{2}
\]
- MAP:
\[
580\mathrm{~mm}
\]
- Length of main water course:
\[
8.50\mathrm{~km}
\]
- Height of most remote point above outlet:320 m
- H0.85L:
\[
135\mathrm{~m}
\]
- H0.10L:
- Return period factor \((\mathrm{Ft})\) :
Assume overland flow as 150 m and \( r=0.4\)(average grassland).
Table 1: Catchment compilation
TOTAL MARKS: 100 END OF EXAMINATION
QUESTION 7 A buttress dam wall must be designed

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!