Question: Question 1 ( 4 0 Marks ) 1 . 1 Calculate the weight of lime required in a 1 0 0 ton LD converter to

Question 1(40 Marks)
1.1 Calculate the weight of lime required in a 100 ton LD converter to get a basicity of 3 given that 80 ton hot metal contains 0.8% Si and 20 ton scrap containing 0.15% Si (Assume there is no other source silica and that lime contains 90% CaO)[10 marks]
1.2 Explain why much more lime than calculated above (question 1.1) is charged in the LD vessel during blowing? [10]
1.3 What problems are associated with using the type of lime above (question 1.2)?[4]
1.4 As a steel plant metallurgist, what precautions would you take to minimise the problems above (question 1.3)?[6]
1.5 Explain why lime is added in the early stages of the blow and in what ways is the bottom injection practice more beneficial? [4]
1.6 What are risks associated with carried over slag and low CaO content in slag?[4]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!