Question: Question 1 9 ( 1 point ) Saved With a pure contract, allowable costs are shared between the parties on a predetermined percentage basis.

Question 19(1 point)
Saved
With a pure contract, allowable costs are shared between the parties on a predetermined percentage basis.
 Question 19(1 point) Saved With a pure contract, allowable costs are